Home
Company Profile
Market Expertise
Technical Consultancy
Management Consultancy
Public Sector
Test and Calibration
Training & Events
Contact Us
News
Unique Services
Accreditations
Our People
Public Sector
Renewable Energy
Oil & Gas
Environmental
Flow Systems
Flow Measurement
Renewable Energy
Thermal Engineering
Modelling & Simulation
Environmental
Noise & Vibration
Change Management
Knowledge Management
Programme Management
IT Infrastructure
Department of Trade & Industry
Measurement for Innovators
Flow Programme
Programme Management
Measurement for Emerging Technologies
Flow Calibration
Emissions Monitoring
Umbilical Testing
Properties Software - PPDS
Renewable Energy Devices
Erosion & Structural Testing
Myres Hill Test Facility
CPD
Courses & Conferences
Clubs & Groups
Literature Purchase
Visa Application
Club Meetings
Directions
Email
You are here:
TUV NEL
>
Test and Calibration
>
Renewable Energy Devices
>
Myres Hill Test Facility
Site Search:
 
News Headlines:
Vacancy Notice - Emissions Engineers
TÜV SÜD and TÜV Rheinland plan to merge
Event Summaries:
Production and Upstream Flow Measurement Workshop
Privacy, Copyright and Disclaimer
Renewable Energy Devices - Myres Hill test facility
TUV NEL has operated a remote wind turbine test site at Myers Hill, approximately 10km south west of our offices in East Kilbride, since 1984.
Myres Hill enjoys excellent exposure to prevailing south westerly winds. From a technical point of view, the site is covered in grass and heather and has low surface roughness. There are some large areas of forestry are situated approximately 2km from the Myres Hill summit.
Key features of the site are:-
Clean wind flow conditions allowing all operating modes to be tested
Close proximity to TUV NEL providing easy access by staff
Test laboratory buildings available
Unpopulated area permitting research and development and prototype testing of wind turbines
Long-term annual mean wind speed of 7.7 m/s at an elevation of 10m above ground
The site is serviced by 11 kV grid connections and can accommodate generated power levels of up to 1800 kW allowing a wide variety of testing, development and proving to take place.
Find out more about our wind energy services
Contact us
to learn more about using Myres Hill.